Home
About Us
Our History
Our Mission
Our Vision
Our Ethics
Our Team
Mahmoud Deeb AMER
Eng. Hassan M. AMER
Eng. Samer M. AMER
Imad SA’ADEH
Jamal BADREYEH
Samer AL SAQRI
Mohammad AL-KHALIL
Marwan SABRI
Rajaee ABU KHALAF
Jamal AL AWAISHEH
Ahmad HABASH
Services
Non Destructive Testing
Conventional NDT
Gamma Ray Radiography
Magnetic Particle (MT) Testing
Radiographic (RT) Testing
Ultrasonic Thickness Measurement (UTT) Testing
Advanced NDT
Acoustic Emission Testing (AE)
Alternating Current Field
Corrosion Mapping
Guided Wave Ultrasonic Testing (LRUT)
Lifting Equipment Inspection & Certification
Magnetic Flux Leakage
Phased Array Ultrasonic Testing
Pulsed Eddy Current
Remote Visual Inspection (RVI/CCTV)
Robotic Tank Inspection
Rope access
Short Range Ultrasonic Testing (SRUT/Chime)
Time of Flight Diffraction (TOFD)
Tubular Inspection
VertiScan for Boiler Water Wall Tubes Inspection
API Inspection
API 510 – Pressure Vessel Inspection Code
API 570 – Piping Inspection Code
API 653 – Tank Inspection, Repair, Alteration, and Reconstruction
Post Weld Heat Treatment (PWHT)
Welding Inspection
Third Party Inspection Services (TPI)
Training & Certification
Welding – Non Destructive Testing (NDT) Training Courses
Projects
Abdali District Heating & Cooling Plant
ACT – Extension Project
Al Qatrana Power
Amman Boulevard
Amman East PLANT
Aqaba Bulk Chemicals
Aqaba LNG Terminal
Aqaba New Port
Aqaba Oil Terminal Rehabilitation
Aqaba Warehouse
Disi Water Conveyance
Doha International Airport
Establishment of Feeding Point at Arab Gas Pipeline
Feeding IPP3 & IPP4 Power Plants with Natural Gas
Fertelizer Project
Floating Track Harvester
Group Five
HASSAD Project
Jordan Bromine
Jordan IPP3
JPMC
Kemapco
King Hussein Cancer Center
Manaseer Palace
National Chlorine
Phosphoric Acid Plants
Power Plant for Qatrana Cement
Queen Alia International Airport
REHAB Power Station
Rehabilitation of Greater Amman’s Water Supply
Samra power station
SAMRA Waste Water Treatment Plant
South Valley Cement
Sulpher Recovery Unit
Contact Us
Manaseer Palace